Test Intake / DUT Test Scope

Define targets and assumptions before design:

  • DUT part number and revision
  • DUT dimensions
  • Required tests
  • Test time: under 4 minutes
  • Environmental requirements
  • Acceptance criteria
  • Required customer inputs

Test Requirements Specification

Lists all Customer Requirements, derived System Requirements, and resulting Test Requirements (what the tester must verify). Optionally Test System Requirements (what the tester must be capable of)

Test procedure specification

Describes the test flow in high-level pseudocode.

Test Design Specification

  • Mechanical design
  • Electrical design
  • Electrical interface
  • Instrumentation
  • Calibration/self-test
  • Spare parts
  • Supported DUT revisions

Validation protocol + report

Defines what will be checked. The report records what happend. For example:

  • Remove testing pins to simulate 0V on power pins
  • Short testing pins to simulate short-circuits or excessive load.
  • Test known bad boards

Operator instruction

Instruction for the operator on how to setup and execute the test:

  • fixture photo
  • DUT orientation
  • barcode/serial scan step
  • instruments/external tools
  • start button
  • pass/fail indication
  • what to do on fail
  • when to call test engineering
  • cleaning instruction
  • common failure messages

Maintenance guide

  • Daily
  • On start/end of batch
  • Yearly